Items where Author is "Ir. Mayun Nadiasa, MT., MAYUN NADIASA"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Item Type | No Grouping
Number of items: 36.

Article

Anak Agung Diah Parami Dewi, ST, MT.,Ph.D., ANAK AGUNG DIAH PARAMI DEWI and Ir. Mayun Nadiasa, MT., MAYUN NADIASA (2019) FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PENYELESAIAN PROYEK GEDUNG DI KABUPATEN KARANGASEM. Jurnal Ilmiah Teknik Sipil, 23 (1). ISSN 1411-1292

Dr. Ir. I Dewa Ketut Sudarsana, MT, DEWA KETUT SUDARSANA and Ir. PUTU DARMA WARSIKA, M.M., Putu Darma Warsika and Ir. Mayun Nadiasa, MT., MAYUN NADIASA (2018) Development of Assessment Tools for Road Safety Performance during Execution of National Road Project Improvement in Bali-Indonesia. Journal of Safety Engineering, 7 (1). ISSN 2325-0011

Ir. I Ketut Sudarsana, ST, Ph.D, I Ketut Sudarsana and Ir. Mayun Nadiasa, MT., MAYUN NADIASA (2017) ANALISIS FAKTOR YANG MEMPENGARUHI PARTISIPASI DAN NILAI PENAWARAN PESERTA LELANG ELEKTRONIK (E-PROCUREMENT) JASA KONSTRUKSI DI KABUPATEN BULELENG. Jurnal Spektran, 5 (1). ISSN 2302-2590

Ir. Mayun Nadiasa, MT., MAYUN NADIASA and Ir. I Gusti Ketut Sudipta, MT, I GUSTI KETUT SUDIPTA (2017) SISTEM PENGADAAN BAHAN DAN PERALATAN PADA KONTRAKTOR DI KABUPATEN BADUNG, BALI. Jurnal Ilmiah Teknik Sipil, 21 (1). ISSN 1411 – 1292

Ir. Mayun Nadiasa, MT., MAYUN NADIASA and Ir. I Gusti Ketut Sudipta, MT, I GUSTI KETUT SUDIPTA (2017) SISTEM PENGADAAN BAHAN DAN PERALATAN PADA KONTRAKTOR DI KABUPATEN BADUNG, BALI. Jurnal Ilmiah Teknik Sipil, 21 (1). ISSN -

Ir. Mayun Nadiasa, MT., MAYUN NADIASA and Ir. I Gusti Ketut Sudipta, MT, I GUSTI KETUT SUDIPTA (2016) ANALISIS FAKTOR-FAKTOR PENYEBAB TERJADINYA KLAIM DALAM PELAKSANAAN PROYEK KONSTRUKSI BANGUNAN GEDUNG DI KOTA DENPASAR. Jurnal Ilmiah Teknik Sipil, 20 (2). ISSN 1411

Ir. I Ketut Sudarsana, ST, Ph.D, I Ketut Sudarsana and Ir. Mayun Nadiasa, MT., MAYUN NADIASA (2016) ANALISIS FAKTOR-FAKTOR YANG MEMPENGARUHI WAKTU TUNGGU PENGADAAN MATERIAL KONSTRUKSI PADA PROYEK GEDUNG DI KABUPATEN BADUNG. Jurnal Spektran, 4 (2). ISSN ISSN: 2302-2590

Dr. Ir. I Dewa Ketut Sudarsana, MT, DEWA KETUT SUDARSANA and Ir. Mayun Nadiasa, MT., MAYUN NADIASA (2016) PEMBOBOTAN PENILAIAN ASPEK KESELAMATAN DI ZONA KERJA PADA MASA PELAKSANAAN PROYEK PENINGKATAN JALAN. JURNAL TEKNIK SIPIL-UAJY, 14 (1). ISSN 2549 2918

Prof. Dr. Ir. I Made Alit Karyawan Salain, DEA, I Made Alit Karyawan Salain and Ir. Mayun Nadiasa, MT., MAYUN NADIASA (2016) ANALISIS KEPUASAN SATUAN KERJA PERANGKAT DAERAH (SKPD) DAN REKANAN TERHADAP KINERJA UNIT LAYANAN PENGADAAN (ULP) PEMERINTAH KABUPATEN BADUNG. Jurnal Spektran, 4 (1). ISSN 2302-2590

Prof. Dr. Ir. I Made Alit Karyawan Salain, DEA, I Made Alit Karyawan Salain and Ir. Mayun Nadiasa, MT., MAYUN NADIASA (2015) ANALISIS TINGKAT KEMATANGAN (MATURITY LEVELS) UNIT LAYANAN PENGADAAN KABUPATEN BADUNG. Jurnal Spektran, 3 (2). ISSN 2302-2590

Ir. Mayun Nadiasa, MT., MAYUN NADIASA and Ir. Nyoman Martha Jaya, M.Const.Mgt., Ph.D., GCInstCES, NYOMAN MARTHA JAYA (2015) KAJIAN FAKTOR-FAKTOR GREEN CONSTRUCTION PADA PROYEK KONSTRUKSI GEDUNG DI KABUPATEN BADUNG. Jurnal Ilmiah Teknik Sipil, 19 (2). ISSN -

Dr. Ir. I GUSTI AGUNG ADNYANA PUTERA, DEA, I GUSTI AGUNG ADNYANA PUTERA and Ir. Mayun Nadiasa, MT., MAYUN NADIASA (2015) MANAJEMEN RISIKO KESELAMATAN DAN KESEHATAN KERJA (K3) PADA PROYEK PEMBANGUNAN CIPUTRA WORLD JAKARTA. Jurnal Spektran, 3 (1). ISSN ISSN: 2302-2590

Ir. Mayun Nadiasa, MT., MAYUN NADIASA and Dr. Ir. I Nyoman Sutarja, MS., I Nyoman Sutarja (2014) ANALISIS KEPUASAN KONSUMEN BETON READY MIX TERHADAP KUALITAS PELAYANAN PT. SARANA BETON PERKASA. Jurnal Spektran, 2 (2). ISSN 2302-2590

Prof. Ir. Made Sukrawa, MSCE, Ph.D., MADE SUKRAWA and Ir. Mayun Nadiasa, MT., MAYUN NADIASA (2014) ANALISIS PENILAIAN BANGUNAN RUMAH TINGGAL DI KOTA DENPASAR. Jurnal Spektran, 2 (2). ISSN 2302-2590

Ir. Mayun Nadiasa, MT., MAYUN NADIASA and Dr. Ir. I Nyoman Sutarja, MS., I Nyoman Sutarja (2014) MODEL BIAYA TIDAK LANGSUNG PROYEK STRUKTUR GEDUNG BETON BERTULANG. Jurnal Spektran, 2 (2). ISSN 2302-2590

Prof. Dr. Ir. Nyoman Budiartha RM., MSc, I NYOMAN BUDIARTHA RM. and Ir. Mayun Nadiasa, MT., MAYUN NADIASA (2014) Analisis Faktor Kinerja Pengelolaan Air Bersih Perdesaan di Kabupaten Buleleng. Jurnal Spektran, 2 (1). ISSN 2302-2590

Prof. Dr. Ir. I Made Alit Karyawan Salain, DEA, I Made Alit Karyawan Salain and Ir. Mayun Nadiasa, MT., MAYUN NADIASA (2014) Analisis Faktor Yang Mempengaruhi Tenaga Kerja Konstruksi Untuk Memiliki SKA SKTK Pada Kontraktor Di Kabupaten Badung. Jurnal Spektran, 2 (1). ISSN 2302-2590

Prof. Dr. Ir. I Made Alit Karyawan Salain, DEA, I Made Alit Karyawan Salain and Ir. Mayun Nadiasa, MT., MAYUN NADIASA (2014) Analisis Faktor-Faktor Yang Mempengaruhi Gagal Lelang Pengadaan Barang Dan Jasa Pemerintah Secara Elektronik (E-Procurement) Di Kabupaten Badung. Jurnal Spektran, 2 (1). ISSN 2302-2590

Prof. Dr. Ir. Nyoman Budiartha RM., MSc, I NYOMAN BUDIARTHA RM. and Ir. Mayun Nadiasa, MT., MAYUN NADIASA (2013) Analisis Kualitas Pelayanan Pas Bandara Internasional Ngurah Rai Dengan Menggunakan Model Servqual. Jurnal Spektran, 1 (1). ISSN 2302-2590

Gusti Ayu Putu Candra Dharmayanti, ST, M.Sc.,Ph.D., GUSTI AYU PUTU CANDRA DHARMAYANTI and Ir. Mayun Nadiasa, MT., MAYUN NADIASA (2015) Analisis Dampak Risiko Pelaksanaan Konstruksi Gedung Terhadap Biaya, Mutu dan Waktu Proyek.

Gusti Ayu Putu Candra Dharmayanti, ST, M.Sc.,Ph.D., GUSTI AYU PUTU CANDRA DHARMAYANTI and Ir. Mayun Nadiasa, MT., MAYUN NADIASA (2015) Analisis Dampak Risiko Pelaksanaan Konstruksi Gedung Terhadap Biaya, Mutu dan Waktu Proyek.

Gusti Ayu Putu Candra Dharmayanti, ST, M.Sc.,Ph.D., GUSTI AYU PUTU CANDRA DHARMAYANTI and Anak Agung Diah Parami Dewi, ST, MT.,Ph.D., ANAK AGUNG DIAH PARAMI DEWI and Ir. Mayun Nadiasa, MT., MAYUN NADIASA (2014) Investigasi Risiko Pada Proyek Renovasi Gedung Yang Sedang Beroperasi.

Ir. I GUSTI NGURAH OKA SUPUTRA, MT, I GUSTI NGURAH OKA SUPUTRA and Ir. Mayun Nadiasa, MT., MAYUN NADIASA (2016) Pengendalian Biaya dan Waktu Pelaksanaan Proyek Villa Sentosa Dengan Konsep Nilai Hasil.

Conference or Workshop Item

Ir. Ariany Frederika, MT, ARIANY FREDERIKA and Ir. Mayun Nadiasa, MT., MAYUN NADIASA (2019) OPTIMASI PENJADWALAN PROYEK SIX SENSE ULUWATU VILLA RESORTS BALI DENGAN METODE RSM (REPETITIVE SCHEDULING METHOD). In: UNSPECIFIED.

Ir. Ariany Frederika, MT, ARIANY FREDERIKA and Ir. Mayun Nadiasa, MT., MAYUN NADIASA (2019) Anaisis Waktu Tunggu dengan Repetitive Scheduling method (RSM) dalam optimasi penjadwalan pekerjaan berulang proyek konstruksi gedung di badung. In: UNSPECIFIED.

Prof. Dr. Ir. I Made Alit Karyawan Salain, DEA, I Made Alit Karyawan Salain and Dr. Ir. Yenni Ciawi, YENNI CIAWI and Ir. Mayun Nadiasa, MT., MAYUN NADIASA and Anak Agung Gede Sutapa, ST, MT, ANAK AGUNG GEDE SUTAPA (2019) Use of Black Stone Waste as Fine Aggregate in Concrete Mixture. In: UNSPECIFIED.

Anak Agung Diah Parami Dewi, ST, MT.,Ph.D., ANAK AGUNG DIAH PARAMI DEWI and Ir. Mayun Nadiasa, MT., MAYUN NADIASA (2018) KESUKSESAN PENERAPAN SISTEM MANAJEMEN MUTU DI INDUSTRI KONSTRUKS. In: UNSPECIFIED.

Anak Agung Diah Parami Dewi, ST, MT.,Ph.D., ANAK AGUNG DIAH PARAMI DEWI and Ir. Mayun Nadiasa, MT., MAYUN NADIASA (2018) SUCESSFUL IMPLEMENTATION OF QUALITY MANAGEMENT SYSTEM IN CONSTRUCTION. In: UNSPECIFIED.

Prof. Dr. Ir. I Made Alit Karyawan Salain, DEA, I Made Alit Karyawan Salain and Dr. Ir. Yenni Ciawi, YENNI CIAWI and Ir. Mayun Nadiasa, MT., MAYUN NADIASA and Anak Agung Gede Sutapa, ST, MT, ANAK AGUNG GEDE SUTAPA (2018) Use of Black Stone Waste as Coarse Aggregate in Concrete Mixture. In: UNSPECIFIED.

Ir. Ariany Frederika, MT, ARIANY FREDERIKA and Ir. Mayun Nadiasa, MT., MAYUN NADIASA (2017) Penerapan Sistem Manajemen Keselamatan Dan Kesehatan Kerja (SMK3) Menggunakan OHSAS Pada Proyek Pembangunan Fave Hotel Kartika Plaza Kuta. In: UNSPECIFIED.

Ir. Mayun Nadiasa, MT., MAYUN NADIASA and Anak Agung Diah Parami Dewi, ST, MT.,Ph.D., ANAK AGUNG DIAH PARAMI DEWI (2017) ANALISIS KETERLAMBATAN PROYEK DI KABUPATEN KARANGASEM. In: UNSPECIFIED.

Prof. Dr. Ir. I Made Alit Karyawan Salain, DEA, I Made Alit Karyawan Salain and Dr. Ir. Yenni Ciawi, YENNI CIAWI and Ir. Mayun Nadiasa, MT., MAYUN NADIASA and Anak Agung Gede Sutapa, ST, MT, ANAK AGUNG GEDE SUTAPA (2017) Penggunaan Limbah Batu Tabas Sebagai Agregat Halus Dalam Campuran Beton. In: UNSPECIFIED.

Dr. Eng. Ni Nyoman Pujianiki, ST, MT, M.Eng, NI NYOMAN PUJIANIKI and Gusti Ayu Putu Candra Dharmayanti, ST, M.Sc.,Ph.D., GUSTI AYU PUTU CANDRA DHARMAYANTI and Ir. Mayun Nadiasa, MT., MAYUN NADIASA and Dr. I NENGAH SIMPEN, M.Si, I NENGAH SIMPEN (2016) Perancangan Sistem Pengadaan Air Bersih di Samuh Bugbug Karangasem. In: UNSPECIFIED.

Dr. Ir. I Dewa Ketut Sudarsana, MT, DEWA KETUT SUDARSANA and Ir. Mayun Nadiasa, MT., MAYUN NADIASA (2016) Pembobotan Penilaian Aspek Keselamatan di Zona Kerja Pada Masa Pelaksanaan Proyek Peningkatan Jalan. In: UNSPECIFIED.

Gusti Ayu Putu Candra Dharmayanti, ST, M.Sc.,Ph.D., GUSTI AYU PUTU CANDRA DHARMAYANTI and Ir. Mayun Nadiasa, MT., MAYUN NADIASA (2015) ANALISIS RISIKO PADA PROYEK RENOVASI DAN PENGEMBANGAN GEDUNG HOTEL. In: UNSPECIFIED.

Gusti Ayu Putu Candra Dharmayanti, ST, M.Sc.,Ph.D., GUSTI AYU PUTU CANDRA DHARMAYANTI and Ir. Mayun Nadiasa, MT., MAYUN NADIASA (2015) Judul Poster - Analisis Dampak Risiko Pelaksanaan Konstruksi Gedung Terhadap Biaya, Mutu dan Waktu Proyek. In: UNSPECIFIED.

This list was generated on Sat May 4 02:38:37 2024 WITA.